Rocky Mountain Research Station Logo USDA Forest Service
Rocky Mountain Research Station
Forestry Sciences Laboratory - Moscow, Idaho
Moscow Personnel  |  Site Index  |  Site Map  |  Moscow Home
Project Information  |  Modeling Software  |  Library  |  Project Photos  |  Offsite Links  |  Eng. Home

Soil & Water
Engineering Publications


Project Leader:
William J. Elliot
email Bill

Contact Webmaster
email webmaster

Database updated
861 days ago

Measuring effectiveness of three postfire hillslope erosion barrier treatments, western Montana, USA

Robichaud, P.R.; Pierson, F.B.; Brown, R.E.; Wagenbrenner, J.W. 2008. Measuring effectiveness of three postfire hillslope erosion barrier treatments, western Montana, USA. Hydrological Processes 22:159-170.

Keywords: erosion mitigation; silt fence; contour-felled log; straw wattles; contour trenches; rainfall simulation; erosion barrier

Links: pdf PDF [1.1 MB]

Abstract: After the Valley Complex Fire burned 86 000 ha in western Montana in 2000, two studies were conducted to determine the effectiveness of contour-felled log, straw wattle, and hand-dug contour trench erosion barriers in mitigating postfire runoff and erosion. Sixteen plots were located across a steep, severely burned slope, with a single barrier installed in 12 plots (four per treatment and four plots left untreated as controls. In a rainfall-plus-inflow simulation, 26 mm h-1 rainfall was applied to each plot for 1 h and 48 L min -1 of overland flow was added for the last 15 min. Total runoff from the contour-felled log (0.58 mm) and straw wattle (0.40 mm) plots was significantly less than from the control plots (2.0 mm), but the contour trench plots (1.3 mm) showed no difference. The total sediment yield from the straw wattle plots (0.12 Mg ha-1) was significantly less than the control plots (2.2Mg ha-1); the sediment yields in the contour-felled log plots (0.58 Mg ha-1) were not significantly different. trench plots (2.5 Mg ha-1) were not significantly different.

After the simulations, sediment fences were installed to trap sediment eroded by natural rainfall. During the subsequent 3 years, sediment yields from individual events increased significantly with increasing 10 min maximum intensity and rainfall amounts. High-intensity rainfall occurred early in the study and the erosion barriers were filled with sediment. There were no significant differences in event or annual sediment yields among treated and control plots. In 2001, the overall mean annual sediment yield was 21 Mg ha-1; this value declined significantly to 0.6 Mg ha-1 in 2002 and 0.2 Mg ha-1 in 2003. The erosion barrier sediment storage used was less than the total available storage capacity; runoff and sediment were observed going over the top and around the ends of the barriers even when the barriers were less than half filled.

Moscow FSL publication no. 2008l